With season start coming, I dropped some of the to do list for the first comp, in favor of drive time..
I replaced the battery wires and plugs to start with.
I also upgraded from 300mah 2s 35-70c to 300mah 2s 45-90c.. It seemed to really wake the motor up! I was actually pretty surprised..
Then I went crawling.. Everything about this rig just flat out works! I did find one crawl that I struggled with, with a 2.2.. So I took pics..
Turn into the rock to get the front up
Turn away from it to get the driver side tire out of getting swallowed
Back to get both fronts on
Wiggle steering to get back end over
Then just work ur way up and out
Came home to some mail...
These are MY 1 of 2 sets of these Beautiful TURBOTECH wheels!
Already had the Shift hubs by lattice innovations.. Build/built time...
I got spacers and screw's for 2 piece 1/2" wide wheels or 3 piece 9/16" wide wheels.. One of each..
And both semi built.. I have some work to do on the Shift hubs.. Clear out what's showing, tap for 3mm hardware and finish the other 3 bead ring holes with black hardware..
These wheels utilize 2-56 aluminum spacers and 2-56 red aluminum screw's, for the bead area. Then 3mm Shift hub hardware.. Which the Shift hubs come with 4-40 screw holes and 6 holes drilled to the perfect size to run a 3mm two thru, and ur done!