Outer Walls, Rafters, Roofing. Need to get myself 2 more sheets of 1in foam for the roof so a few pieces of OSB are just temp put on, then it'll all be covered in Ice guard, then Metal. Eventually I'll likely build deck over it as I have a dirt oval going in over in that area so it can double as somewhat of a drivers stand, at least to some extent, if its a deck anyways.
But after putting on the foam and osb on the rest of the roof, buttoning up a few things and adding a little bit of sealer to a couple spots. Once the roof is fully sheeted, and ice shielded, I'll be able to call Tue am to get the next inspection done and should be ready for my HVAC guys on Friday.
Still need to finish cutting out the pass through once the next inspection is passed, then I can also insulate the walls, get the door installed and then finish up the steps area. the landing is about 4inches of pea gravel over cinder blocks that were empty, and there is ad drain that dumps into a bucket, which is under the cincerblocks also surrounded with deep pea gravel to help keep water out. If I need I can install a small sump pump into the bucket and dump the water right into my drain field tile which is just a couple feet from the building side. Will be nice to have heat again by this weekend. Old furnace is working but has a cracked heat exchange so it is tripping the sensor after a while so I just don't run it. It started shitting out beginning of spring when it wasn't too bad out and I'm just not getting it done finally. 12G later, but getting an American Standard 96% 80k furnace, with a heat exchanger in the mix. Unsure if I'll go with a standard A/C or Heat Pump at this point, but will likely go with a Heat Pump next year after I pay down most of this project here.
I still need to redo the roof on the house, and I'm thinking of Repitching it to 4.5/12 from its current 3/12 pitch, then a full resheet, added insulation in the attic, then metal roofing to finish it off. So may not do a heat pump or a/c for a few years. Guess we'll see how fast I can pay this shit off. And that depends on what may come in RC that I Cant wait to have, further causing pain. lmao