Probably not, but I will say that we are working on a change for the mini that will lower temps a lot and boost up the performance.
Approx ETA on this new and improved BR Mini?
What happens to the rest of us that has the old version.
A batch is entering production now, but I'm not sure if the updated hardware is going to be available. Lead time on parts is 10 weeks, and lead time on manufacturing is 12. If we didn't get the timing right it will be the following batch, and we will mark down the "regular" batch in between time.
It is a change of hardware for better performance, so while the ESC won't look any different to the eye or castle link it will be different.