It was time to say good bye to narrowed AR60 in the front.
In rear i will keep the narrowed Ar60 with Xr lockouts.
Short side was normal lenght. Long side was narrowed about 2cm.
With narrowed axle i didn't get enough steering for my liking.
And there was no room for more steering angle.
So now testing full widht AR60 in the front.
So it was time to take new and some used parts to the table.
I think this was supposed to go here and hold the servo stand...?
It was 2 small i think... I couldn't trust it would hold in my beating.
So little bit longer worm and we are good to go :ror:
Now i can trust that it will hold.
So here we have the trust installed on the axle. LOOKING GOOD! :twisted:
Time for little Beefing :twisted:
In the narrowed version i didn't have tubes inside...
Ok 2cm piece in the narrowed part to get them hold together.
These tubes are from asiatees. Ok quality and prize. 14€ for axle.
Ofcourse the metal is not the same level as the Original Beeftubes.
I have 2 set's of them in the shelf. I don't want to use them to this project
Because... :roll:
I'm going to machine them open from upper part. :shock:
Old axle had original plastic link/shock mounts.
Now testing VP versions that i had in my wraith.
Starting to look like winner axle ;-)
I like how the servo is sitting low.
"New" locker. This is used in my wraith for over 1 year in brutal use.
Still zero sloppy.
Old one is VP aluminium locker... No set screws so they were sloppy.
So it was time to but them in scale... Steel vs Aluminium! :shock:
Steel won! :shock: Ok it's machined much smaller. Aluminium locker that size would brake very easily. I think with set screws the aluminium version would weight 19g. Not big difference in weight.
So it was time to attach gear to the locker.
This is old OD gear from the narrowed axle. I can't see any wearing.
I don't know how old this is. I have driven 1 year and don't know how long Manu used it before that.
So it was time to take the shafts to some tweaking to get more steering angle.
It was time look at the weights in the front.
VP versions weights.
Old axles had 240g of weight.
Now i think i don't need so much becouse the tubes in axle.
So little sawing and we are good to go.
Now i have 100g weight per side.
These weight's are machined nicely.
They don't fit to my knucles so... Little twaeking is needed for these to fit.
I got these little bad boys from the Nordics -16 sponsor gift suffle.
Time to take them to action. Old axle had BTA so there was only 1 in the front. Now i need them both side becouse the steering rod comes in front.
Axle "installed"
I need new titanium upper links. First some testing to get the lengt.
Old links are about 1,5-2cm short.
Need to change the electronic plate mount place.
So the servo sit's little lover and ofcourse the electronics.
Got my self 3d printer
Now i think i have more motivation to train how to make 3d models
I don't have to wait that my friend has time to make the print.
First part for my safty. Rear weight holder.
This is only prototype made from PLA.
I think i will make the final version from BLA and if i can get Nintek Armadillo then make them from that.
Armadillo Shore Hardness =
75D
Abrasion resistance 84% better than PLA and 60% better than ABS
https://ninjatek.com/products/filaments/armadillo/
Fitted nicely for these wheels.
They are little bit out from the wheel. That don't matter becouse i have to make the rear little narrower so then they will go inside of the wheel.